Project Overview: Heavy-Duty Refinishing in Hammersmith

A premium restoration of 36 square meters of timber flooring in a busy Hammersmith townhouse, focused on maximum durability and elegance.

The Challenge

The client required a high-performance finish for heavy-use areas that would maintain its clarity and sheen over time without yellowing.

Our Solution

  • Sanding: A 3-stage precision sanding process using dust-free technology.
  • Cleaning: Intensive buffing and vacuuming to ensure zero contamination for the final finish.
  • Finishing: Applied 3 coats of Superior (2k) Lacquer in a Satin sheen. The two-component (2k) system provides exceptional chemical and scratch resistance.

The Result

A stunning, glass-like finish that highlights the wood’s grain while providing the toughest protection available on the market. The project was completed within the 3-day estimate with zero dust mess.

Location: Tabor Road, Hammersmith W6
Duration: 3 Days
Total Project Value: £1,445 (VAT Inclusive)

Related Projects: View our Fulham Dinesen Restoration or our Chiswick Large-Scale Restoration.